Sunday, June 02, 2013

NEW TOWER CRANE ASSEMBLED AT BETHESDA ROW (PHOTOS)

Time to brush up on crane signals again.

A second tower crane now looms over Bethesda Row, at the construction site of The Darcy, The Flats and a 900-space underground public parking garage. It was assembled ahead of schedule by Miller and Long yesterday.

"Lower the boom, and raise the load!"

No comments:

Post a Comment