You can see that piles have been driven into the earth around the edges of the lot. Unlike some stick-built projects (such as the old Arlington Road post office site), The Lauren will have a 2-level underground parking garage, requiring significant excavation, if not to the extreme of the Lot 31 site a 2 blocks south on Woodmont Avenue.
Bethesda news, restaurants, nightlife, events and openings, real estate, crime reports and more - the way only a lifelong Bethesda resident like Robert Dyer can bring it to you. Everything you want and need to know about Bethesda, plus special investigative reports you won't find anywhere else. The must-read blog for breaking Bethesda news, when you want to be the first to know.
▼
Tuesday, September 16, 2014
BETHESDA CONSTRUCTION UPDATE: THE LAUREN ULTRA-LUXURY CONDOS (PHOTOS)
Construction is still in the early stages at the Hampden Lane site of the future ultra-luxury condos called The Lauren. Schnabel (whose logo you will see on a piledriver in these photos) is a foundation and earth retention firm, and that's where this project is at for the moment.
THEY MADE A HUGE MISTAKE "THE SCHNABEL" SOUNDS SO MUCH BETTER THAN "THE LAUREN"
ReplyDelete