The tower crane has been erected at the 7340 Wisconsin Avenue construction site in downtown Bethesda. It's ready to do the heavy lifting for the redevelopment of the former Exxon gas station property. The future high-rise building will include 315,000 gross square feet of development, 300 to 308 residential units, ground floor retail, and around 158 parking spaces. Greystar is the developer, SK+I Architecture of Bethesda is the architecture firm, and John Moriarty & Associates is the main construction contractor.
Bethesda news, restaurants, nightlife, events and openings, real estate, crime reports and more - the way only a lifelong Bethesda resident like Robert Dyer can bring it to you. Everything you want and need to know about Bethesda, plus special investigative reports you won't find anywhere else. The must-read blog for breaking Bethesda news, when you want to be the first to know.
Wednesday, April 24, 2024
Tower crane installed at 7340 Wisconsin Avenue construction site in Bethesda (Photos)
The tower crane has been erected at the 7340 Wisconsin Avenue construction site in downtown Bethesda. It's ready to do the heavy lifting for the redevelopment of the former Exxon gas station property. The future high-rise building will include 315,000 gross square feet of development, 300 to 308 residential units, ground floor retail, and around 158 parking spaces. Greystar is the developer, SK+I Architecture of Bethesda is the architecture firm, and John Moriarty & Associates is the main construction contractor.
Subscribe to:
Post Comments (Atom)
1 comment:
Any word on what they're doing at the old Bank of America spot on river road? They're got construction equipment out there now and it's blocked off
Post a Comment