W.C. & A.N. Miller has revealed its plan to redevelop part of the parking lot at its Shops at Sumner Place property at 4701 Sangamore Road in Bethesda into an apartment building. The Apartments at Sumner Place would be 5 stories and 57' tall, and house 132 rental apartments, 20 of which would be Moderately-Priced Dwelling Units (MPDUs). Parking would be provided in an underground parking garage at the rear of the building (facing the Sumner Village condos). Amenity common areas in the building might include a fitness center, party room and an outdoor terrace.
A new curb cut will be added to Sentinel Drive beyond the existing one, near the property line with Sumner Village. It will be used for loading dock access. From the renderings shown, the building will block the view of the shopping center from the units in Sumner Village that will be directly behind it.
W.C. & A.N. Miller also revealed that it has future plans for the part of the parking lot along Sentinel Drive where a drive-thru ATM is currently located. A rendering shows that area being replaced in the future by a new retail building, a daycare facility, and a playground. A second pad site retail building facing the new Apartments at Sumner Place across the main driveway through the parking lot is also shown for a future phase. It would take some of the parking currently used by Safeway customers.
![]() |
| Phasing plan showing future retail buildings, daycare facility and playground (far left and center) |
As I reported last week, a required public meeting on the proposal will be held tonight, April 13, 2023, at 7:00 PM at Capital Workspaces (located over the Safeway at The Shops at Sumner Place) at 4701 Sangamore Road, Suite 100N. A Montgomery County Development Review Committee meeting on the plan is scheduled for April 25. W.C. & A.N. Miller currently hopes to formally submit its Preliminary Plan and Site Plan for the project to Montgomery County in June or July.
A public hearing on the plans would be expected to be held by the Montgomery County Planning Board in October or November 2023. There is not yet a timeline for the groundbreaking or delivery of the project.