Let's return to the construction site of the Cheltenham apartments at 4725 Cheltenham Drive in downtown Bethesda. Equipment and materials are being moved into place for the assembly of a tower crane at the former Midas property. A 102-unit apartment building, it has gotten the most attention for not including on-site parking. A public parking garage is located directly across the street.
Bethesda news, restaurants, nightlife, events and openings, real estate, crime reports and more - the way only a lifelong Bethesda resident like Robert Dyer can bring it to you. Everything you want and need to know about Bethesda, plus special investigative reports you won't find anywhere else. The must-read blog for breaking Bethesda news, when you want to be the first to know.
Monday, September 29, 2025
Bethesda construction update: Cheltenham apartments (Photos)
Let's return to the construction site of the Cheltenham apartments at 4725 Cheltenham Drive in downtown Bethesda. Equipment and materials are being moved into place for the assembly of a tower crane at the former Midas property. A 102-unit apartment building, it has gotten the most attention for not including on-site parking. A public parking garage is located directly across the street.
Subscribe to:
Post Comments (Atom)
1 comment:
No parking garage is a no for me.
Post a Comment